Solar Panel Ground Mounting Brackets
Solar panel ground mounting brackets are structural components used to secure solar panels to the ground. Jesfer solar brackets provide a stable structure that supports the weight of the solar panels and allows them to be tilted toward the sun for maximum energy production. They provide a stable and durable foundation for solar panels, allowing them to be installed in a variety of outdoor locations such as vacant lots, commercial sites and residential properties.Solar ground mounting bracket systems include various hardware components such as bolts, nuts, clamps, and connectors. These are used to hold rails, posts and brackets together to form a cohesive, strong structure.
Aluminium ground mounting system picture
Technical parameters of solar ground bracket
System Name |
Solar Panel Ground Mounting Brackets |
Panel Layout |
Landscape or Portrait |
Foundation |
Ground Screw & Cement Board |
Material |
Anodized AL6005-T5 &Q235B(Hot-Dip Galvanized) |
Tilt Angle |
0-60 degrees |
Fastener |
SUS304 &Zinc-Nickel Alloy Electroplated Steel |
Snow Load |
1.6 KN/㎡ |
Color |
Customized or Silver |
Wind Load | 60 m/s |
Design Standard |
AN/NZS1170,DIN1055,JIS C8955,etc. |
Applicable Solar Module |
Framed or Frame-less |
Warranty |
10 Years ,25 years life span |
Ground Clearance | 500-200mm | Small Components | Anodized AL-6005-T5 |
Business Terms and Other Details of solar ground mounting system:
1)Delivery Terms:
FOB, CNF, CIF,EXW are available.
For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.
2)Terms of payment:
Deposit before production by T/T, The balance shall be paid after inspection and before shipment.
3)Production time:
Sample order normally take about 3-7 days .and bulk orders usually take about 20-30 days.
4)Time of shipment:
For Southeast Asia:10-15 days.
For Europe:around 30 days
For Africa:around 20-30 days
For the Middle East :around 20-30 days
For South American countries:around 40-50 days
5)Production and transportation of aluminum solar ground mounting:
Production:
We have a lot of production equipment, for large orders, we can complete production faster than many competitors.
Transportation:
Our city has international seaport by Xiamen and international airport by Gaoqi, goods can be easily transported to all parts of the world.