Solar Energy System

Dual Pilled Photovoltaic PV Aluminum Ground Mounting

Aluminium solar PV ground mounting design with dual-pile ,no embracing bar request,saving installation time and material cost.

  • Item NO.:

    JS-GM10
  • Payment:

    TT,Western Union
  • Product Origin:

    China
  • Color:

    Normal
  • Shipping Port:

    XIAMEN
  • Lead Time:

    15-25days after receiving the deposit
  • Product Detail

Dual Pilled Photovoltaic PV Aluminum Ground Mounting 

PV aluminium ground mounting no need to drill holes on the support beam,it could improves the structure strength with more durable.Moreover,ground mounted PV systems could fixed on the post through specially designed clamps,while applying the same gravity direction.Aluminium PV ground mount is a cost-effective solutions for the installation of large scale commercial solar ground projects.


Feature of PV aluminium ground mounting

#Materials:

High quality of aluminium alloy for beams and rails ,stainless steel for end clamps ,mid clamps ,screw and nut,not recycled materials .

#Stand Length:

Standard of beams,rails 3.1m,4.1m,5.1m .It could be joined together for longer length .

#Colors:

Normally is silver . The black colors could be customized if the quantity is enough .

#Packaging:

Wooden tray , iron tray or standard carton.


System structure of aluminium ground mounting

 Bificial Solar Module Power Structure


                                                          Double Posts Without Side Support


Technical Parameters of aluminium alloy PV ground mounting

 System Name
 PV Ground Mount System 
 Panel Layout
 Landscape or Portrait
 Foundation
 U Post
 Material
 Anodized AL6005-T5 &Q235B(Hot-Dip Galvanized)
 Tilt Angle
 0-60degrees    
 Fastener
 SUS304 &Zinc-Nickel Alloy Electroplated Steel
 Snow Load
 1.6KN/㎡   
 Color
 Customized or Silver
 Wind Load  60m/s  Design Standard
 AN/NZS1170,DIN1055,JIS C8955,etc.
 Applicable Solar Module
 Framed or Frame-less
 Warranty
 10 Years  
 Ground Clearance  500-200mm  Small Components  Anodized AL-6005-T5


Components details of photovoltaic aluminium ground mounting 

Solar Panel HardwareSplice for Cross Beam kit


Specification:L260mm

Components:Splice for Cross Beam 85 ,Hexa Self-Tapping Screw

With EPDM Washer ST6.3*19


Mounting Hardware For Solar PanelsCross Beam

Specification:L*71*85

Standard Length:3100mm,4100mm,5100mm

Solar Hardware Products 

Pre-Assemble Support

Components:Beam,C Clamp 80,T Shaped Joint

Flat Washer M8,Spring Washer M8

Hexagon Socket Head Bolt M8*25

Solar Mounting HardwareU Post

Specification:L150

Material:Steel Q235B(Hot-Dip Galvanized)

Ace Hardware Solar Panel Wide End Clamp Kit

Components:Wide End Clamp, Cross Module,

Spring Washer M8,Hexagon Socket Bolt

Solar Panel Installation Hardware Inter Clamp Kit

Components:Inter Clamp,Cross Module

Spring Washer M8,Hexagon Socket Bolt

Solar Panels Mounting HardwareC Clamp Kit

Components:C Clamp, Cross Module,Spring Washer M8

Hexagon Socket Bolt

Solar Roof Mounting HardwarePost Plate A

Specification:L90

Material:AL6005-T5(anodized)

Solar Panel Mounting HardwarePost Plate B

Specification:L70

Material:AL6005-T5(anodized)




Installation guide of aluminium PV ground mounting 

Cheap Solar Panels Installation Guide

1.Install U post based on project solution.

2.Install post plate

3.Install rail.

4.The installation of rail is done.

5.Install beam.

6.The installation of Beam is done

7.Fix the solar module with Inter Clamp Kit&End Clamp Kit.

8.Installation is done.


Business Terms and Other Details of solar ground mounting system:

1).Delivery Terms:

FOB, CNF, CIF,EXW are available.

For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.

2).Terms of payment:

Deposit before production by T/T, The balance shall be paid after inspection and before shipment.

3).Production time:

Sample order normally take about 3-7days .and bulk orders usually take about 20-30 days.

4).Time of shipment:

For Southeast Asia:10-15days.

For Europe:around 30days

For Africa:around 20-30 days

For the Middle East :around 20-30 days

For South American countries:around 40-50 days

Production and transportation of aluminum solar ground mounting

1).Production:

We have a lot of production equipment, for large orders, we can complete production faster than many competitors.

2).Transportation:

Our city has international seaport by Xiamen and international airport  by Gaoqi, goods can be easily transported to all parts of the world.


Excellent quality made us more competitive in the markets, we are always looking for good partners for long cooperation, if you are interested in aluminium alloy solar ground mount, please contact us right now.Jesfer! Your Best Choice, Your Reliable Supplier!


How to purchase of dual pille photovoltaic PV aluminum ground mounting?

Please check our FAQ to get more information,or contact with us at email info@jesferindustry.com

whats-app:0086 157 5792 9740 2

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Contact info
Tell Us Your Needs
We uphold Quality as we do in Helath ,Safety and Environment.

click here to leave a message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact