Ground Screws Pile House Foundation
Ground screw house foundation piles are made of high-quality steel and are coated with zinc to prevent corrosion. Screw pilings offer several advantages over traditional concrete foundations, such as faster installation, minimal site disruption, and adaptability to different soil conditions.It's important to consult with structural engineers and experienced professionals in ground screw pile installation to ensure proper design, installation, and compliance with local building codes and regulations.
✦Features of house helical piles
♤ Quality and material
The raw materials of house on screw piles is made of 100% new hot dipped galvanized Q235 carbon steel,not scrap.
♤ Specification
diameter :76mm (other:48/ 60/76/89/114mm, etc.)
Thickness:3mm (2/2.5/2.75/ 3.25/ 3.5/4mm,etc.)
Length optional:1600mm,1800mm,2000mm,2200,2500,3000mm
Ground Screw Type:Flange,Non-Flange ,Adjustable
Flange Type:D180x8mm/D200x8mm/ D220x8mm, etc
Package:Steel Pallet
♤ Customized service
OEM ground screw dimension accepted.Welcome to contact us to get more information .
✦Variety ground screws for house
✦Loading photo ofgalvanized screw piles
✦Benefits of using ground screw piles for house foundations include:
♤ Time and Cost Savings: Ground screw pile installations are generally faster compared to traditional concrete foundations, reducing construction time and labor costs.
♤ Stability: The helical screw piles provide excellent stability and load-bearing capacity, ensuring a strong foundation for the house.
♤ Minimal Site Disturbance: Ground screw pile installations require less excavation and disruption to the construction site compared to conventional foundations. This can be especially beneficial in environmentally sensitive areas.
♤ Adaptability: Ground screw piles can be adapted to various soil types and ground conditions, making them suitable for a wide range of locations.
✦Business terms and other details of screw pile solutions
♤ Delivery Terms:
FOB, CNF, CIF are available.
For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.
♤ Terms of payment:
Deposit before production by T/T, The balance shall be paid after inspection and before shipment.
♤ Production time:
Sample order normally take about 3-7days .and bulk orders usually take about 20-30 days.
♤ Time of shipment:
For Southeast Asia:10-15days
For Europe:around 30days
For Africa:around 20-30 days
For the Middle East :around 20-30 days
For South American countries:around 40-50 days
Production and transportation of steel screw piles
♤ Production:
We have a lot of production equipment, for large orders, we can complete production faster than many competitors.
♤ Transportation:
Our city has international seaport by Xiamen and international airport by Gaoqi, goods can be easily transported to all over the world .