Steel Helical Piles Foundation for UK Germany
Helical piers foundation has excellent advantages from wind loads and lateral pull, to horizontal load and lift,compared to concrete footings foundation which are held in the ground mostly by their own weight.Our steel helical piles are installed in a matter of minutes, with no waiting time and immediately usable and able to withstand pressure, and the ground is restored to its original state by simply unscrewing the device. The screw piles are reusable and can be relocated as many times as necessary.Save time and money using our eco-friendly ground screws rather than using concrete for your foundations. Great for garden rooms, decking and fencing.Screw pile footings with variety flange dimension could be customized ,you are warmly welcome to contact us to share with your screw foundation project ,we could suggest prefect solutions of ground screw to match with your ground.Contacting with us for now,we are here to support you !
1.Features of helical piers foundation
●Quality and material
High class hot galvanized 80micro on surface,make sure long service life span more than 20 years .The raw materials of ground screw pile is made of 100% new one ,not scrap.quality is our culture!
●Standard size:
diameter :76mm
Thickness:3mm
Length optional:1600mm,1800mm,2000mm,2200,2500,3000mm
●Customized service:
OEM ground screw dimension accepted.welcome to contact us to get more information .
2.Drawing of screw pile footings
3.Other screw in ground post
4.Business terms and other details of ground screws
1).Delivery Terms:
FOB, CNF, CIF are available.
For some countries, we can cooperate with DDP, such as Philippines, Malaysia, Thailand, Vietnam, Botswana and so on.
2).Terms of payment:
Deposit before production by T/T, The balance shall be paid after inspection and before shipment.
3).Production time:
Sample order normally take about 3-7days .and bulk orders usually take about 20-30 days.
4).Time of shipment:
For Southeast Asia:10-15days
For Europe:around 30days
For Africa:around 20-30 days
For the Middle East :around 20-30 days
For South American countries:around 40-50 days
Production and transportation of steel screw piles
5).Production:
We have a lot of production equipment, for large orders, we can complete production faster than many competitors.
6).Transportation:
Our city has international seaport by Xiamen and international airport by Gaoqi, goods can be easily transported to all over the world .
5.Loading photo of steel helical piles